KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
' style=
Date:  4-26-2023
Number of Hours:  12.00
Manual Reference:  OP-58
Brief Description:  Install Cowl Louvers (Cont.)

I applied the 5 layers of fiberglass cloth, followed with a layer of peel ply, and allowed it to cure for 3 days before sanding smooth. The layup went well but it took a lot of hours to get multiple layers applied wet. After sanding, I measured where to install the louvers, then drilled and clecoed the 18 holes for each louver. Next, I marked the holes which will be the center points for a step-down drill and redrilled these holes with a ¼” bit so the step-down drill wouldn’t “wander” from its center point.
' style=

Louver Slot Drilling Diagram

Louver Slot Drilling Diagram

' style=

Holes Drilled and Marked

Holes Drilled and Marked

' style=

Louvers Clecoed In-Place

Louvers Clecoed In-Place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.