KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
' style=
Date:  4-14-2023
Number of Hours:  6.00
Manual Reference:  DWG 45
Brief Description:  Install & Seal Baffles, Glass in Ramps

Today I riveted the front baffles onto their angle brackets. Next, I caulked all the baffles with high temperature RTV. Finally, I sanded the intake ramps and added a 2nd coat of fiberglass epoxy with both flox and microbeads. Since I share the hangar with 3 other pilots, we have agreed to turn the heat down to 40F every night, I will leave the fiberglass epoxy alone to cure for 3 or 4 days. Next week, I will re-sand with 80-grit sandpaper, then 120 grit to make the intake ramps smooth.
' style=

Hi Temp RTV & Rivet Front Baffles

Hi Temp RTV & Rivet Front Baffles

' style=

Microbead-Epoxy on Ramps

Microbead-Epoxy on Ramps

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.