Brief Description: Instruments installed in the panel
I finally had some time to install all the instrumentation into the panel cutouts. Every instrument cutout required some filing and a couple things like the AOA instrument and the remote ELT indicator required a fabricated cover-plate because the measurements provided on the websites weren't accurate...and I cut the holes about 1/16" too big. All-in-all it turned out well and I am pleased.