Date:  11-18-2020
Number of Hours:  4.00
Manual Reference:  
Brief Description:  L. wing leading edge

Time to get back to work on the L. wing. Got the leading edge out of storage and put it into the construction cradle. The "OP-46" Stall warning system gets installed into the leading edge. So, i got the switch mount installed and match drilled.
Then, i disassembled the leading edge. De-burred all edges and holes. Then removed the vinyl from the rivet lines.