KitLog pro

Powered By Kitlog Pro v2.0

MICHAEL'S WEB SITE

Builder:
Michael Truett
Location:
, -
Aircraft:
Vans Aircraft - RV-9A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
488 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 05-18-2020
3.5
R. Fuel Tank. (Masking And Assembly)
Details
       

 05-15-2020
2.0
R. Fuel Tank (Drain And Fuel Cap)
Details
       

 05-06-2020
3.0
R. Fuel Tank (assembly Begins)
Details
       

 04-26-2020
1.0
R.fuel Tank. (Dimpling)
Details
     

 04-19-2020
4.5
R. Fuel Tank (Dimpling)
Details
       

 04-16-2020
2.5
R. Fuel Tank. (De-burr)
Details

 04-07-2020
5.5
R Fuel Tank (Inboard Rib Modifications)
Details
       

 04-03-2020
5.5
R Fuel Tank (Tank Attach Angle)
Details
       

 04-02-2020
3.0
R. Fuel Tank (Attach Brackets)
Details

 04-01-2020
5.5
R. Fuel Tank (Drill And CS.)
Details
       










Copyright © 2001-2020 Matronics. All Rights Reserved.