Powered By Kitlog Pro v2.0
MICHAEL'S WEB SITE
RV-9A
All
11-15-2020
< Previous Log Entry
Next Log Entry >
Date:
11-15-2020
Number of Hours:
2.50
Manual Reference:
Brief Description:
Aileron and flap "Gap" fairings
Drill, de-burr, and prime the aileron and flap "Gap fairings".
Install and rivet in place.
Time to store this wing away and get to work on the L. side again. That will give me "table space" to begine making the other fuel tank. Oh What Fun!
Prepped and Primered
Flap fairing installed
Aileron fairing installed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
286
1243
Avionics
1
4
Empennage
71
282
Engine
1
1
Fuel Tank Assembly
18
96
Fuselage
77
363
Service Bulletins
2
2
Tech Support
1
1
Tools
7
32
Wings
108
462
Copyright © 2001-2024 Matronics. All Rights Reserved.