KitLog pro

Powered By Kitlog Pro v2.0

MICHAEL'S WEB SITE
' style=
Date:  1-15-2022
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Landing gear mounts

Time for landing gear mounts.
Started by pre-fitting the L. & R. landing gear leg into its mount. It is an increadably snug fit and required a bit of "polishing" the inside of the mounts and the leg surfaces. Once they were slid fully into place, i did the final "Ream to size" of the leg mounting bolt hole.
Good thing i read ahead a few weeks ago and ordered the proper size (0.311") reamer for the job.
I got lucky, and Brown tools had one in the "clearance" area for only about $8.00.

Fit the first weldment into place on the Left side. Match drilled and bolted as required.
' style=

Left side in place.

Left side in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.