Time for landing gear mounts. Started by pre-fitting the L. & R. landing gear leg into its mount. It is an increadably snug fit and required a bit of "polishing" the inside of the mounts and the leg surfaces. Once they were slid fully into place, i did the final "Ream to size" of the leg mounting bolt hole. Good thing i read ahead a few weeks ago and ordered the proper size (0.311") reamer for the job. I got lucky, and Brown tools had one in the "clearance" area for only about $8.00.
Fit the first weldment into place on the Left side. Match drilled and bolted as required.