KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  2-16-2012
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Final flap fairing fitting and drilling- extra pic
' style=

rt flap fairing

rt flap fairing

' style=

Strips of tape to hold the fairing for drilling

Strips of tape to hold the fairing for drilling

' style=

Bottom of right flap fairing. Note the trim line for fit.

Bottom of right flap fairing. Note the trim line for fit.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.