KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  8-13-2011
Number of Hours:  3.75
Manual Reference:  8-47
Brief Description:  Floor boards, baggage floor and baggage shelf

Marked and cut the 4 corners of left and right foot recess wells. Edge finishing

Edge finish the left and right floor panels

Prep the F805 spacers

Clecoed in the L and R floor boards and the baggage floor and shelf.

Final drilled the floor panels and baggage floor and shelf to #30 to the floor ribs.
' style=

Floor, Baggage floor, and baggage shelf

Floor, Baggage floor, and baggage shelf

' style=

Brenda is helping me with the clecos

Brenda is helping me with the clecos

' style=

Drilling floors and baggage area to #30

Drilling floors and baggage area to #30

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.