KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  5-20-2014
Number of Hours:  1.75
Manual Reference:  
Brief Description:  Sanding the cowl

No pics of this exciting work. sorry! I sanded the exterior of the bottom cowl with 60 and 80 grit. Takes forever! I then moved on to the exterior of the uppercowl. This is the second time for the top but didnty do very good the first time.

Flipped uppercowl over and started sanding the inside as well as the upper inlet ramps. I can see the ramps can use some feather in work.

Brenda got some more acetone and bristle brushes so that I can paint on a 50/50 mix of epoxy and acetone after the preliminary sanding is complete.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.