KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  2-4-2023
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Oil Cooler Cable support + prep

I am continuing the oil cooler progress as I have been watching the weather, and there should be some good weather days for shooting some primer coming tomorrow. Today was probably warm enough. Still, it will be warmer tomorrow, so I will wait. I drilled the oil cooler support that Bob provided as part of the hardware. I also cut it down just a bit for a better fit, as he rough cut it oversized. While at it, I decided it was a good time to drill all the rivet holes for the nutplates on the wheel pant attach brackets. They took some time as there are eight nutplates and 16 rivets holes, and then I like to open up the center screw hole so that there is no pinching from a nutplate that is slightly off center. All drilled, all smoothed, and prepped for cleaning and primer tomorrow.
' style=

oil cooler cable support drilled and prepped

oil cooler cable support drilled and prepped

' style=

wheel pant attach bracket drilled for nutplate rivets

wheel pant attach bracket drilled for nutplate rivets

' style=

parts prepped for tomorrow

parts prepped for tomorrow

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.