KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
Work Logs Found: 35
Category Work Time: 81 Hours
 Date
Hours
Work Log Summary

Details

 01-24-2020
0.50
Baggage compartment lighting
Details

 01-23-2020
1.50
Installing the Rear cockpit light rheostat
Details
       

 01-20-2020
1.50
Finished wiring the front cockpit lights
Details
       

 01-18-2020
3.00
Gluing the front cockpit lights
Details
       

 01-16-2020
1.70
Last two fuse busses installed
Details
       

 01-14-2020
3.00
Wiring the front cockpit lights
Details
       

 01-12-2020
1.70
Solder and install the dimmers
Details
       

 01-11-2020
4.50
Front cockpit lighting
Details
       

 01-11-2020
1.50
Dimmer work on the 10-2 switch
Details

 01-06-2020
1.20
Wiring the 700-10-2 DPDT switch
Details
       

 01-04-2020
2.00
Routing path of aft strobe wires
Details

 01-03-2020
2.00
Right console panel hole drilling and installing
Details
     

 01-02-2020
2.40
Finished front seat heat wiring
Details
       

 01-01-2020
0.50
Smoke system pump and front seat heat
Details
       

 12-31-2019
2.00
Wiring the Rheostat + solder
Details
       

 12-27-2019
2.00
“Final” cockpit lighting decisions
Details

 12-23-2019
2.50
Making Garmin boxes and mounting to panel
Details
       

 12-21-2019
1.50
switch layout decisions
Details
     

 12-19-2019
2.00
More cockpit lighting work
Details
       

 12-16-2019
1.50
Interior cockpit lighting
Details
       

 12-04-2019
1.60
Front seat heat
Details
       

 11-19-2019
1.00
Molex on the rear seat heat connections
Details
       

 11-16-2019
3.50
B. Aft Seat heat & USB installation
Details
       

 11-16-2019
5.00
A. Molex connections - AeroLED's
Details
       

 11-13-2019
3.00
Rear seat hinge and GIB ergonomics
Details
       

 11-09-2019
1.00
molex work - need better crimper
Details
       

 11-07-2019
1.70
Wired up the first appliance - Pilot USB
Details
       

 11-03-2019
1.00
Installed the first electrical device – pilot USB
Details
       

 10-22-2019
1.00
Wire label and storage
Details
       

 10-14-2019
2.00
Switches and switch locations
Details
       

 10-10-2019
2.00
Aux power supply install
Details
       

 09-29-2019
1.50
Beginning the Electrical install
Details
       

 09-25-2019
0.50
B and C Electrical order inventory
Details
       

 09-24-2019
17.00
Final electrical decision making and order prep
Details
       

 08-03-2019
1.00
Talked avionics & electrical with Walt
Details
     










Copyright © 2001-2020 Matronics. All Rights Reserved.