KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  12-28-2023
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Flap Relay wiring (except power)

I got the wiring run up to the pilot stick and the flap motor terminals connected - but with more head-scratching on the wire runs. There is extra thinking about where the wires should run to be maintenance-friendly and how this spaghetti of wires makes the flaps go up and down. This part of the learning curve is necessary - but painful. I didn't get a picture from the end of the day, but all wires except the power wires are in place, terminated, labeled, and tested.
' style=

The before picture

The before picture

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.