Powered By Kitlog Pro v2.0
Ivans RV 10
RV10
All
8-7-2008
< Previous Log Entry
Next Log Entry >
Date:
8-7-2008
Number of Hours:
2.50
Manual Reference:
37-3
Brief Description:
Fuel Lines
Step 1: Cut two 45 1/4 fuel lines from ATO_035x3/8 tubing.
Step 2: ASlid on fittings and flared one end of each line.
Step 3: Bent tubing by hand to get dimension as shown in figure 2, 37-3.
Steps 4 & 5: Made necessary bends in tubing to fit in tunnel and for exiting through the F 1004K-L Center Section.
Step 6: Positioned tubing in tunnel and fed other end out to center section. Placed grommits and adel clamps in place as tubing was installed.
Step 7: Installed adel clamps, grommits and F 1084B Systems bracket Clips to the systems brackets.
Step 8: Bent fuel lines 90 degrees back about 2 1/2" outboard of fuselage.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV10 Home
Category
# Logs
# Hours
All
273
519
Aileron Actuation
5
12
Ailerons
1
2
Auto Pilot
3
5
Baggage Area
1
1
Baggage Door
2
4
Elevator
32
79
Empennage Attach
17
24
Fairings
11
16
Flaps
2
0
Fuselage
46
69
Horizontal Stabilize
23
56
Inventory
1
3
Miscellaneous
3
3
Rudder
13
28
Rudder and Brake Ped
4
9
Tailcone
44
79
Tailcone Attach
4
14
Vertical Stabilizer
12
22
Wing Tips
7
19
Wings
29
56
Wiring
13
18
Copyright © 2001-2024 Matronics. All Rights Reserved.