KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
' style=
Date:  7-29-2008
Number of Hours:  1.00
Manual Reference:  37-2
Brief Description:  Fuel Lines

Step 1: Installed the proper 6D fittins on fuel Valve.

Step 2: Bolted the valve to the valve bracket.

Step 3: Installed 6D elbow bulkhead fitting into firewall Bulkhead assembly. Clocked up and to right.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.