KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  8-13-2012
Number of Hours:  0.70
Manual Reference:  
Brief Description:  Sanded Sides of Cowling

The epoxy slurry applied to the sides of the cowling were sanded.
' style=

The left side of the cowling

The left side of the cowling

' style=

The right side

The right side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.