KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  1-22-2011
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Sanded Top Cowl Edge/Drilled Left Side Brace

I took the top cowling off and sanded the left front edge from the inlet back about eight inches. I took the left side brace off the lower cowling and drilled the receptacle holes out of the brace, as well as countersinking the rivet holes.
' style=

The left brace with all holes drilled

The left brace with all holes drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.