Date:  1-11-2011
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Installed Camlocs in Right Side Brace

I drilled the holes for the camloc receptacles and the countersunk rivet holes in the right side brace. The brace was then cleaned up with enamel cleaner and primed. After the primer was dry, The receptacles were riveted in place using AN426-4-5 rivets and the pneumatic squeezer. The top cowling's camloc holes on the right side were upsized to 15/32" with the Unibit. The grommets were inserted with the snap rings installed onto the grommets. The studs were then inserted into the grommets.
' style=

Right side bracket after priming and riveting receptacles in place

Right side bracket after priming and riveting receptacles in place

' style=

The right side brace clecoed to the lower cowling

The right side brace clecoed to the lower cowling

' style=

The top cowling with the grommets installed

The top cowling with the grommets installed