KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-23-2010
Number of Hours:  0.10
Manual Reference:  
Brief Description:  Photos-Top Cowling Braces Clecoed in Place
' style=

The right cowling brace drilled in place

The right cowling brace drilled in place

' style=

Both cowling braces clecoed after the center overlap was removed

Both cowling braces clecoed after the center overlap was removed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.