KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  8-24-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Taped Canopy in Preparation of Glassing

The roll bar fairing was sanded with 60 grit sandpaper along an inch line from the aft edge. New bids of glass will be laid on the roll bar fairing overlying the canopy.The canopy was taped over with duct tape so that the new glass will lie flat on the canopy. A red line was drawn on the duct tape at approximately one inch from the windshield edge.
' style=

The left side

The left side

' style=

The right side

The right side

' style=

The left side with the gaps covered

The left side with the gaps covered

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.