KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  6-15-2012
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Sanded Canopy Fairing

The canopy fairing was sanded with 60 grit sandpaper wrapped around the paper tube.
' style=

The right side after sanding

The right side after sanding

' style=

The left side during sanding with some of the primer removed

The left side during sanding with some of the primer removed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.