KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-1-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Added Bondo to Fuselage/Sanded Fairing

I checked the area on both sides of the fuselage where the new fairing will join with the roll bar fairing. The areas did not have any bondo to make a smooth transition, so more bondo was mixed up and spread in the areas. They were then sanded.

The roll bar fairing had the two ends, outer and underside, sanded with #60 grit sandpaper, in order to make a smoother transition with the new fiberglass fairing to be made.
' style=

One end sanded down

One end sanded down

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.