KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  4-23-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Sanded Bondo on Fuselage/Windshield

The layer of bondo was sanded down. A few more golfballs of bondo were applied over the low areas. These were sanded. I believe that the area is ready for fiberglass. I just need to position the fairing over the roll bar and sand the fairing in preparation of joining the fairing with the new fiberglass.
' style=

The center area

The center area

' style=

The right side

The right side

' style=

The left side

The left side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.