Brief Description: Added BB's and Epoxy-Flox Slurry to Left Elevator
The left elevator was removed from the vertical stabilizer. The gap in the elevator forward of the lead counterweight had the paint sanded off. A small strip of glass was inserted and an epoxy-flox slurry was dripped into the gap. About thirty BB's were dropped into the slurry. Another strip of glass was placed on top of the slurry. This was done to rebalance the elevator.