KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  1-9-2010
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Powered up Panel/OAT Wiring

I swapped out one of the #8 screws on the ground block with a cap screw. I attached the power supply ground to the other screw on the ground block and powered up the panel again. Everything still works!

I started on the wiring, with cutting off the insulation on the OAT wire and crimping Molex connectors to the wires. Unfortunately, I didn't read the Dynon instructions properly and plan on installing the shielding and the other ground wire from the EFIS. I also need to properly crimp the Dsub connectors by using the E crimper for the wire crimp and the B crimper for the insulator crimp.
' style=

Ground wire from power supply connected to panel ground

Ground wire from power supply connected to panel ground

' style=

Power supply ground

Power supply ground

' style=

OAT wires with connectors crimped.

OAT wires with connectors crimped.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.