More tie-wrapping was done on the EGT and CHT wires and the alternator wires on the right side. The bolts holding the alternator in position were loosened and the alternator was pushed down using a hammer handle. The bolts were then tightened up and safetied.
The last six holes for the GPS antenna bracket were drilled in the firewall and the holes were enlarged to #30 size.