KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-21-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Dave Ross' Visit

Dave and Patti Ross stopped by. Dave looked over the engine installation that is done so far and the canopy work. He gave me a few suggestions for installing the oil cooler and the manifold pressure hose. He liked the canopy aft fairing that Jeff and I made.

Dave expressed concern over the prop bolt lengths in the flywheel. He thought that the studs(?) should extend beyond the flywheel much farther than they currently do, which is only 1/4". I need to check into that.
' style=

The prop bolt studs on the flywheel

The prop bolt studs on the flywheel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.