KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  1-29-1998
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Tech Counselor Visit/Spars

First visit by Peter Aragon, Tech Counselor of EAA Chapter 846. Pete inspected both wing spars, rudder and right elevator. He was pleased with everything. Drilled out five bad rivets in right spar and two rivets in left spar. Reriveted them, much better results. Assembled both left and right spars completely together, adding all flange strips and bolting them together. Found that the 6-12 rivets needed to cut down 1/16." Started to shorten a few.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.