KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  7-11-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Pitot Tube and Heat Controller Screwed in Place

The pitot tube was screwed onto the pitot mast. The pitot heat wiring had spiral wrapping placed on it to keep the wires from flopping around. The heat controller was screwed in place.
' style=

Pitot tube screwed in place

Pitot tube screwed in place

' style=

The pitot heat wiring

The pitot heat wiring

' style=

The pitot heat controller

The pitot heat controller

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.