Powered By Kitlog Pro v2.0
Baker's RV-6
RV-6
Wings
6-18-2013
< Previous Log Entry
Next Log Entry >
Date:
6-18-2013
Number of Hours:
1.00
Manual Reference:
Brief Description:
Slotted Fuel Tank Brackets
The fuel tank brackets that had been drilled to the fuselage bracket had slots cut into each of them. This was done per Van's suggestion in a past RVator. Nutplates will be riveted to each fuselage bracket.
Right fuel tank bracket
Left fuel tank bracket
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-6 Home
Category
# Logs
# Hours
All
3121
5540
Avionics
4
6
Canopy
334
544
Control Systems
8
12
Cowling
164
199
Empennage
326
666
Engine
84
124
Finish Kit
9
17
Firewall Forward
353
570
Flight Training
1
7
Fuselage
643
1225
Inspection
1
0
Instrument Panel
142
227
Interior
4
8
Landing Gear
28
46
Miscellaneous
22
13
Painting
113
256
Prop
3
4
Shop Construction
50
24
Systems
11
35
Tools
1
0
Weighing
8
7
Wings
686
1334
Wiring
126
216
Copyright © 2001-2024 Matronics. All Rights Reserved.