KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  2-5-2013
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Double-checked Wing Leveling

Even though the rear spars had already been drilled, I spent some time checking both wings to ensure that they were level. The level was laid on the wing at various points, with the forward edge of the level laid at the forward edge of the main spar flange. The block of wood was laid over the rear spar flange and the level was checked to zero.
' style=

The level set on the left wing

The level set on the left wing

' style=

Zero degrees

Zero degrees

' style=

The block of wood holding the level

The block of wood holding the level

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.