KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  9-25-2007
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Riveted Baffle to Left Tank

Wiped down all rib flanges, left baffle and left tank skin with MEK. Practiced the placement of the baffle into position. Placed tape on inside of tank skin just above the baffle flange on top and bottom skins. Mixed 70 grams of Proseal and applied to fuel vent line fitting inside tank and filled some small voids inside tank. Spread Proseal on rib flanges and tank skin. Added extra Proseal in each corner of tank. Positioned baffle and clecoed to tank.

Because the outboard corner on right tank had a large gap in the Proseal, I dug it out to allow the placement of more Proseal into the entire corner and hopefully ensure a good seal.

Assisted by Dad
' style=

Left Tank Baffle Riveted

Left Tank Baffle Riveted

' style=

Left Tank Baffle Riveted in Place

Left Tank Baffle Riveted in Place

' style=

Left Tank Baffle

Left Tank Baffle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.