KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  8-2-2007
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Rivet Outboard Tank Ribs Misc. Stuff

Made two .032 1X2'' pieces to use to cover tooling holes in both outboard tank ribs. Drilled four #30 holes in each piece and rib. These pieces will be placed on inboard side of rib. Will place 470-4-4 rivets in both outboard tank ribs as well.

Filled up some air pockets along stiffeners with Proseal.

Made up 40 grams of Proseal.

Left fuel tank: Scuffed up filler vent and tank skin. Cleaned everything with MEK. Riveted filler vent to left fuel tank by back-riveting, using 3-4.5 rivets for attaching tank vent line and fuel level indicator. Cleaned off excess Proseal with MEK. Cleaned & riveted fuel vent fitting with spacers to right root rib. Used hand squeezer to rivet.
' style=

Right Inbd Rib w/all Components

Right Inbd Rib w/all Components

' style=

Right Inbd Rib w/all Components

Right Inbd Rib w/all Components

' style=

Tank Side of Right Inboard Rib w/all Components

Tank Side of Right Inboard Rib w/all Components

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.