|
|
Baker's RV-6
|
Date: 10-12-2005
|
Number of Hours: 5.00
|
Manual Reference:
|
Brief Description: Doublers-LW Spar
|
|
Countersunk #40 holes in top & bottom of spar for all doublers. Used electric drill for countersinking. Cleaned & primed all doublers, as well as the inside of both wing access panels.
Used pneumatic squeezer to rivet doublers to top of spar between ribs 4/5, 5/6, 6/7, 7/8, & 8/9 and to bottom of spar between ribs 1/2, 2/3, 3/4, 4/5, 5/6, 6/7, 7/8, & 8/9.
Countersunk #21 holes in top & bottom of spar for all holes along fuel tank screw lines.
Clamped both top skins to skeleton to check fit.
|
|
Doubler added to Spar Flange by Rib 9
|
|
Left Wing Top Skin
|
|
Spar Flange betw/Ribs 1-5 w/Doublers
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |