Used #6 countersink to enlarge access panel holes in spar. Riveted nutplates to spar. Placed rib 8A in place on spar. Found that bracket was not riveted into proper position on rib 8A. Drilled out rivets. Clecoed rib to spar & clamped bracket to rib. Drilled rib to bracket.