KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-9-1997
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Elevators

Cleaned shop in preparation of shop tour by EAA Chapter 846. Took wrapping off horizontal and vertical stabilizers for display.

Using pneumatic squeezer, dimpled holes in skin and tip ribs where counterbalance skin lies. Bent flanges of tip rib to bring skin in line without being bowed out. Bent both edges of elevator that overlays counterbalance skin to put a very minor crease in them so that, after riveting, elevator skin will lie flat.

Found that top side of left elevator has small crease (~2") forward of trim tab cutout. Pressed some of the crease out by hand.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.