KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  6-19-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Bolted HS and VS to Fuselage

The horizontal and vertical stabilizers were bolted to the fuselage. The elevators were temporarily attached to the horizontal stab. Both elevators are trailing-edge heavy and they should be the opposite. It is probably because of the amount of paint. I talked with Joe Blank-Van's who suggested to get lead shot and epoxy it around the lead weights on the elevator horns.
' style=

The horizontal and vertical stab bolted to the fuselage

The horizontal and vertical stab bolted to the fuselage

' style=

Right elevator

Right elevator

' style=

Left elevator tail-heavy

Left elevator tail-heavy

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.