KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  1-17-2012
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Took HS and VS off Fuselage/Cleaned off Plastic

The elevators, flaps and ailerons were taken down from the shelves. Plastic was still on the flaps, which had to be pulled off. Almost all of the plastic was able to be pulled off. One small section of plastic could not be pulled off. I used the heat gun to heat up the plastic and then scraped almost all of it off. The horizontal stab and vertical stab were removed from the fuselage so that the fiberglass tips could be primed by Walt Halloran.

Visitor-Bernie Ockuly
' style=

The flaps and elevators

The flaps and elevators

' style=

The fuselage missing the empennage

The fuselage missing the empennage

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.