KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  1-15-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Drilled Empennage Fairing to HS and VS

The empennage fairing had the drilled holes opened up. Additional holes were drilled into the vertical stab and the horizontal stab. The fairing was placed in place and the holes were transferred to the fairing.
' style=

The fairing drilled to the VS and the HS

The fairing drilled to the VS and the HS

' style=

The lower fairing

The lower fairing

' style=

The right side

The right side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.