KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  12-15-2011
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Added One Bid of Glass to Right Lower Fairing

I had installed the empennage fairing onto the fuselage the day before and a weak area on the lower right fairing had cracked the microballoons that had filled the area. The area was sanded on the inside and a single layer of glass was laid in place.
' style=

The layer of glass

The layer of glass

' style=

The crack on the outside

The crack on the outside

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.