KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-21-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Applied Duct Tape on Fuselage and HS

I brought all of Jeff's fiberglass supplies out to the shop, in preparation of adding fiberglass to the empennage fairing. The fuselage and HS had duct tape applied to them. Electrical tape was placed on the insulation molds. The right elevator was removed.

Packing tape will be applied next over the duct tape.
' style=

Duct tape on the fuselage and HS

Duct tape on the fuselage and HS

' style=

The left underside

The left underside

' style=

The right side

The right side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.