KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-10-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Sanding of Fairings

The fairings were sanded with the orbital sander with 80 grit and then the sandpaper.
' style=

The left elevator fairing

The left elevator fairing

' style=

The left fairings

The left fairings

' style=

The HS fairing

The HS fairing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.