KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-7-2011
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Made Left Emp Fairing Insert and Microballoons

The left empennage fairing was the last fairing that needed to have a front edge made out of microballoons and epoxy. Electrical tape and insulation was used again to make a mold in which the micro mix was set into.
' style=

The wet microballoon mix

The wet microballoon mix

' style=

The two elevator fairings

The two elevator fairings

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.