KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-2-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Right Fairings/Torqued Elevator Weights/VS

The counterweights in the elevator horns were bolted and torqued. Torque seal was added on each nut. The holes in the vertical stabilizer were dimpled.
' style=

The right fairings

The right fairings

' style=

The left counterweight in the elevator horn

The left counterweight in the elevator horn

' style=

The VS holes that were dimpled

The VS holes that were dimpled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.