KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-5-1996
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Vertical Stabilizer

Drilled last two holes in top corner of vertical stab. Drilled third hole in forward spar and tip rib. Riveted forward spar to tip rib. Pinned skeleton to jig and clecoed skin to skeleton. Found that interior dimpled holes were not deep enough. Had to take skin off and redimple. Clecoed skin back on to skeleton. Riveted left side of skin to skeleton. Started in center of forward spar and center rib and worked down the rib and to the bottom of forward spar and then riveted top part of forward spar. Had a few rivets that will need to be drilled out. Put a smile on skin by one rivet.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.