Brief Description: Moved Wires/Adjusted Plenum Flange/Visitor
Time was spent moving wires and tubes around in the engine compartment.
With Walt's assistance, we heated the aft flange of the plenum so that it would lie flat against the baffling. A few years earlier, the top of the plenum had been heated and pushed down, because of cowling interference. This caused the flange to bend outward. Walt and I applied heat to the flange and then pressed it back into position with wood blocks. By doing this, the screw holes aligned much better with the baffling.
Visitor: Joe Walker
The plenum clecoed on the engine
The aft flange lies more tightly against the baffling