KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  4-18-2014
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Tightened and Torqued Final Four Spar Bolts

The bolt going thru the spar and the right fuel side cover had to be removed so that the bolt next to it could be tightened. After that was completed, the other three spar bolts were tightened and torqued. The nuts had torque seal applied.
' style=

The left spar bolts tightened

The left spar bolts tightened

' style=

The right spar bolts tightened

The right spar bolts tightened

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.