KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-29-2013
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Clearcoat Sprayed on Fuselage

The cowling was removed and covered. The engine compartment was covered and bagged, in preparation of clearcoating the fuselage. The cockpit was unmasked and remasked. Walt Halloran sprayed the fuselage with two coats of clearcoat and then sprayed the top of the fuselage with an additional coat.
' style=

The fuselage after clearcoat

The fuselage after clearcoat

' style=

The aft left side of the fuselage

The aft left side of the fuselage

' style=

The right side

The right side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.