KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-22-2013
Number of Hours:  0.10
Manual Reference:  
Brief Description:  Photos 2-Gold Painted on Fuselage
' style=

Gold painted on the aft part of the fuselage

Gold painted on the aft part of the fuselage

' style=

The empennage fairing with gold paint

The empennage fairing with gold paint

' style=

The 1/4'' tape pulled off the green stripe after the gold was applied

The 1/4'' tape pulled off the green stripe after the gold was applied

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.