KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-11-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  7-Primed/Painted Lower Part of Vertical Stab

Walt Halloran had originally masked off the lower part of the spar of the vertical stablilizer and painted every other part of the VS. Walt primed and then painted the lower spar.
' style=

The lower spar of the vertical stablilizer

The lower spar of the vertical stablilizer

' style=

Sharpie lines left on the VS

Sharpie lines left on the VS

' style=

Sharpie lines on the VS coming thru the primer/paint

Sharpie lines on the VS coming thru the primer/paint

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.